{"componentChunkName":"component---src-templates-page-node-js","path":"/boylston-drive-sidepath-realignment","result":{"data":{"site":{"siteMetadata":{"title":"Sandy Springs Gov"}},"nodePage":{"title":"Boylston Drive Sidepath & Realignment","drupal_id":"19582ee3-062a-41ca-b958-cd73a90c89ba","path":{"alias":"/boylston-drive-sidepath-realignment"},"body":{"processed":"<h3>Project Status</h3>\n\n<p>Construction underway with intermittent lane closures. Storm structure installation and utility relocations nearing completion. Road grading operations continue.</p>\n\n<h3>Project Description</h3>\n\n<p>The project will realign the intersection of Boylston Drive and Hammond Drive so that Boylston Drive connects to the Hammond Glen Retirement Community driveway at a single signalized intersection.</p>\n\n<p>The new entrance to the office building at 325 Hammond along the Hammond Glen driveway is open for traffic. The former driveway has been permanently closed and the new access point will serve as the sole entrance for the building.</p>\n\n<p>Planned improvements also include streetscape enhancements and a side path along Boylston Drive.</p>\n\n<div data-embed-button=\"media_entity_embed\" data-entity-embed-display=\"view_mode:media.original\" data-entity-embed-display-settings=\"[]\" data-entity-type=\"media\" data-entity-uuid=\"6372406a-6281-4df0-9226-b4d87fa6eae1\" data-langcode=\"en\" class=\"align-center embedded-entity\"><article class=\"media media--type-image media--view-mode-original\">\n  \n      \n            <div class=\"field field--name-field-image field--type-image field--label-hidden field__item\">  <img loading=\"lazy\" src=\"/sites/default/files/2025-07/Plans%20Photo.jpg\" width=\"1650\" height=\"2550\" alt=\"Image showing proposed changes to intersection of Boylston and Hammond Drives.. New crosswalks, grass, sidewalks.\">\n\n</div>\n      \n  </article>\n</div>\n\n\n<p>Utility relocations are ongoing and are expected to be completed in November 2026.</p>\n\n<p>Construction is anticipated to take approximately 15 months and is currently estimated to be completed in January 2027.</p>\n\n<p>Cost: $2,980,000.</p>","summary":"Boylston Drive Sidepath & Realignment"},"cta":null,"metatag":[{"attributes":{"name":"title","content":"Boylston Drive Sidepath & Realignment"}},{"attributes":{"name":"description","content":"Boylston Drive Sidepath & Realignment"}}],"relationships":{"type":{"name":"Page"},"field_tags":[{"name":"Construction Project","relationships":{"parent":[{"name":"SandySpringsGA.gov"}]}}]},"field_date":{"value":"May 21, 2021"},"field_long_title":"Boylston Drive Sidepath & Realignment","field_page_layout":"sidebar"}},"pageContext":{"slug":"/boylston-drive-sidepath-realignment"}},"staticQueryHashes":["1413031684","1419465866","171188893","1898769931","2277259475","2391788990","2930285144","3009090991","3276874092","3290541562","3434133909","3584882192","3909622830"]}