logo

North End Roadway Safety Analysis

The North End Roadway Safety Analysis study area consists of four roadway corridors located in the north side of Sandy Springs. The City of Sandy Springs identified fourteen intersections and one roadway segment in the four roadway corridors that have experienced higher than normal number of vehicular crashes from 2016 to 2020.

Ultimately, the goal of this study is to develop recommendations for the North End area to create a safe, convenient and comfortable environment for motorists, pedestrians and bicyclists.  

Project Schedule

October 18, 2022 - North End Roadway Safety Analysis Final Report

October 18, 2022 - North End Roadway Safety Analysis City Council Presentation

May 2022 - A public input survey was conducted.

April 26, 2022 - North End Traffic Safety Public Meeting Presentation

January 11, 2022 - North End Roadway Safety Analysis Scope and Study

 

Dog Man: The Musical
City Springs Event

Dog Man: The Musical

Saturday, October 11
Dog Man: The Musical, based on the worldwide hit by Dav Pilkey, follows the hilarious, heartwarming adventures of Dog Man, who with the head of a dog and the body of a policeman, loves to fight crime and chew on the furniture.
View Event
Los Lonely Boys standing outside
City Springs Event

Los Lonely Boys

Thursday, November 20
Henry, Jojo, and Ringo Garza have been playing together since they were teenagers. The Boys rode their bluesy “Texican rock & roll” sound and their blockbuster hit "Heaven" to worldwide fame - one of rock’s great Cinderella tales.
View Event