Sandy Springs Circle Pedestrian Enhancements

Print
Press Enter to show all options, press Tab go to next option
Print
Press Enter to show all options, press Tab go to next option

Project Description

The project consists of the installation of a 9 ft wide sidewalk with a 2 ft brick paver strip that will comply with the Sandy Springs zoning overlay, in order to fill in the gaps of sidewalks. Pedestrian scale lighting, crosswalks, street trees and associated landscaping may be included. Bike lanes are NOT a part of this project.

Project Status

The design consultant has completed the concept report and the report is under review with FHWA.

Project Schedule

 Design consultant is currently in the scoping phase with ARC/GDOT.

 Reference Number: CC9 & 10