Project Description

The project consists of the installation of 9 ft wide sidewalks with a 2 ft wide brick paver band. Set backs, street trees, landscaping, pedestrian scaled street lights along with improved safety and accessibility will be addressed.  

Project Schedule

Construction is underway. Motorists should expect lane closures between the hours of 9:30 pm - 6:30 am as a majority of the work involving lane closures will be conducted at night.  Work includes construction of curbs, gutters, and installation of street lights. 

The work area includes both sides of Roswell Road from Cliftwood and Carpenter to Hammond Drive. 

Project Reference #T-0008