The City of Sandy Springs approved an Intergovernmental Agreement (IGA) with the City of Roswell, on July 13, 2010 to fund the SR 9/Roswell Road Pedestrian and Bicycle Bridge over the Chattahoochee River. The IGA provides a maximum contribution from Sandy Springs of $50,000.00 for Preliminary Engineering and $312,572.50 for Construction for a total match of $362,572.50, representing a 50 percent share with the City of Roswell for the required local match. The total project cost (PE and CST) is $3,705,645.00, which includes federal grant funding. The City of Roswell is acting as the contract manager for the project and selected design consultant Heath and Lineback (H&L) through a competitive bid process. Concept design was initiated May 2011. Two public scoping meetings were conducted in October 2011 in each City to provide an opportunity for early public input on possible bridge alignments and bridge type.

Project Status

A design consultant Heath and Lineback (H&L) was awarded a contract to provide design services. The concept report was approved by GDOT. Design and environmental coordination are underway.

 

Handout distributed during Ocober 11 Public Input Meeting 

Bridge Location Concept Maps

Bridge Design Concepts Discussed during the February 7, 2012 City Council Work Session 

Project reference number #T-35

 

Return to full list >>
View Full Site